TClarke has won the building services programme working with Principal Contractor IHP to deliver the Integrated Front Door Project for The Great Western Hospital at Swindon within their Way Forward Programme. The Programme has identified that the existing Great Western Hospital (GWH) is currently operating with a 110-bed capacity deficit, resulting in the frequent occurrence of ‘corridor care’. The Integrated Front Door (IFD) project will consist of a refurbishment of a large proportion of the GWH West Wing Ground Floor combined with the Construction of a ‘new build’ extension.
TClarke’s package includes:
Electrical works:
- LV Distribution
- Photovoltaics
- UPS/IPS for medical systems
- Bedhead Systems
- Lighting
- Small Power Fire Alarm
- Access Control
- CCTV
- Nurse Call system
- Data
- Earthing & Bonding
- Lightning Protection
Mechanical works:
- Full HVAC system including additional air handling units, heater batteries, DX units and air source heat pumps
- Medical gas services
- BCWS and SCWS
- LTHW CT and VT systems
- CWS
- Rainwater and above ground drainage